Rasi Homes is coming up with elegant residential apartments at OMR titled The Ark. Each apartment is carefully designed for the best look, beautiful interiors, sufficient ventilation and offered with world class amenities. Offered in a range of 2 BHK and 3 BHK, these are built with top branded floorings and fittings.
Address: Near Sithalapakkam
LandMark: Near Asiana Hotel
Project Summary
Project Code2412
Built-up Area
1020 - 1453 Sq. Ft
Bedrooms
2 - 3
Specification
+
Structure
RCC framed structure
Foundation and structure designed for seismic zone III
9†brickwork for external walls or wienerberger blocks.
4 1/2†brickwork for internal partition walls or wienerberger blocks
Flooring
Branded 2x2 vitrified tiles for living, dining, kitchen and bedrooms with 4†skirting.
12†x 12†ceramic tiles for security room, driver room, EB room and lumber room.
Terrace area will be finished with 9†X9†pressed terra cotta tiles.
Branded external flooring for car parking area and driveways.
Wall and Ceiling Finishes
Smooth putty finish for internal walls and premium emulsion paint.
Smooth putty finish for external walls with exterior grade emulsion.
Enamel paint for window grills.
Doors and Windows
Entrance main door frame will be of teak wood.
Branded UPVC window frame and shutters
Country wood for all bedrooms, bathrooms and balcony door frame.
Bathroom – ventilator with fixed louvers
Sakthi brand moulded panel door for main door, bedrooms.
Plastic coated special doors for bathroom and balcony.
Electrical
100% power backup
AC provision in bedroom living and dinning
Remote control switches in master bedrooms
Litaski brand modular switches
3 phase power supply
Cable TV provision in living and master bedroom
DB having ELCB, MCB and manual phase over rotary switches for each apartment.
Elevators
Bradned 6 passenger lift with variable voltage frequency (V3F) and automatic rescue device (ARD) technology.
Anti- termite Teatment and Water Proofing
Water proofing treatment will be done for all sunken portion and water storing bodies
Anti-termite treatment will be done on various stages
Water
One deep borewell or one well to supply water
One underground sump with adequate capacity to store panchayat water supply.
2 nos of overhead tank to store panchayat and borewell water.
Plumbing and Sanitaryware
Sanitary ware from parryware brand. White colour
CP fittings from parryware
All bathrooms will have provision for an exhaust fan and geyser connection.