Vinayaga Palace is an ongoing residential project by Venus Homez located at Kalyani Nagar, Kovur. The project is well planned and developed with quality products and offers 2BHK apartments designed with basic amenities and at a reasonable cost. The property is situated at a good residential area and is well connected to transport modes, educational institutions, IT companies and other civic utilities. Architectural Designed Flat,
Near By Schools & Colleges & IT Park :
Schools
1. Sri Krish International School
2. Omega International School
3. PSBB Millennium school.
4. MANGADU PUBLIC SCHOOL
Colleges
1. St Joseph's Arts and Science College
2. Madha Medical College and Hospital
3. Madha Engineering College
4. Sri Muthukumaran Institute of Technology
IT PARK
1. DLF IT PARK
2. L&T INFOTECH.
Address: Kalyani Nagar,, Kovur, Chennai.
LandMark: Opposite to St. Joseph’s College of Arts and Science
Project Summary
Project Code2850
Built-up Area
918 - 975 Sq. Ft
Bedrooms
2 - 2
Specification
+
Key Factors of VINAYAGA PALACE
Features
30 Feet Road Width
CMDA APPROVED LAYOUT
Building Plan Approval CMDA 0392/2016
100% Vastu compliant
Teak Wood Joineries
3 Phase EB
130 Feet Bore water
Run-through Lintel's
100% Water Curing
Coromandel Cements
Sump & Septic tank.
CEMENTS
We use India Cements Coromandel King or Aditya Birla's ULTRA TECH which is a
53 grade cement.These Varieties comes under 53 grade OPC (Ordinary Portland
Cement), which are high strength cement used for building runways, concrete
roads and bridges.These products are useful in providing high strength
concrete in RCC works, runways, concrete roads, bridges and in multi-storey
buildings.
Teak Wood Doors & Windows
We use teak wood for doors , frames & Window Shutters. The main door will
be solid teak door with melamine polish all round.The Window shutters has
framed teak wood with glass.
Water Curing
After concrete or Brick work or Plasterwork is placed, we cure them with
water for a period of minimum 7 days which increases the strength &
Stability of the building. Concrete or Brick work or Plasterwork which is
moist cured for 7 days is about 80% stronger than uncured concrete.