Ben Foundation's Maple Orchard comes up with luxurious apartments with covered car parking, lift, excellent interiors, spacious rooms and with world class fittings. Each apartment is carefully crafted with ample ventilation. The Stilt +6 storey tower house has 2 BHK and 3 BHK apartments that come with state-of-the-art amenities that truly make it a world class home.
Address: No.1 South park road(Padikuppam)Annanager west extension, Chennai-40
LandMark: Near MMM & Cheriyan Heart Hospital
Project Summary
Project Code2242
Built-up Area
710 - 1125 Sq. Ft
Bedrooms
2 - 3
Specification
+
Structure:
R.C.C.Framed Structure and brick walls with elegant appearance strictly adhering to quality.
Flooring:
2 X 2 vrit tile flooring in all rooms.
Doors:
a) Main door will be provided by Teak frame with OST flush door.
b ) Bedroom doors will be of Country wood frame with Flush door.
c ) Toilet doors country wood frame with frame with flush door, water Proof.
Windows:
All windows will be GI metel with MS grill.
Hall/Dining :
a ) TV point and Telephone point will be provided.
b ) Four Light and point, One Chandelier point, two fan point, three 5 Amps Plug, Point will be provided.
Toilet :
a ) One white IWC in common toilet and white EWC with flush tank, one white ordinary white basin in attached bath and white wash basin for dining ared will be provided.
b ) 7 feet height glazed tiles in all bathrooms.
c ) Ceramic tiles flooring in all bathroom.
d ) Geyser provision in both bathrooms.
e ) Exhaust fan provision in both bathrooms.
f ) Mixer tap arrangement in both bathroom.
Kitchen:
a ) 10 feet Black colour granite platform on one side only.
b ) Stainless steel sink with necesssary tap.
c ) Aqua Guard, Exhaut fan provision will be provided.
d ) Necessary water tap in balcony will be provided.
e ) One Light point, two 5 Amps plug points and one 15 Amps plug will be provided.
f ) No kitchen shelf will be provided.
g ) Two feet height glazed tiles over cooking platform.
Electrical work:
a ) Concealed wiring PVC conduits with ISI marked copper wiring and switches will be provided.
b ) Three Phase with MCB and rotary switches will be provided.
Bedrooms:
a ) A/c Point for one bed room, 3 Light Point, One Fan Point and two 5 Amps plug points will be provided.
b ) Provision for Cupboard.
Plumbing work:
a ) Concealed PVC pipeline for cold water and concealed GI pipeline for hot water.
Painting:
a ) Two coats of colour Cement Paint for inner and outer walls.
b ) Varnish finish for Main door.
c ) Two coats of enamel paint over one coat of primer for wooden works.