We take a great privilege to get you know about one of our Project in Tambaram East, Pace Adarsa on the Tambaram Velacherry Main Road, Which is ready to move in.
We would be pleased to assist you further on your queries.
Rate per sq ft Rs.5795/- + Other Charges.
Price Is Negotiable.
2 Flats only available here.
Flat no. E 6 2BHK & Flat No.9 3BHK
south facing flats.
Flats available only on the 8th floor.(top floor)
Address: Velachery Main Road, , Chennai
LandMark: Near Christian College
Project Summary
Project Code1965
Built-up Area
896 - 1715 Sq. Ft
Bedrooms
2 - 3
Specification
+
RCC works
Footing, Columns, Beams, Lintels, Sunshade, Floor slabs – As per structural design
Brick work – Walls
4.5" bricking – Partition walls
9" bricking – Peripheral walls
Plastering walls -1/4"to1/2" thick – rich mix 1:3
Ceiling underside, floor slabs, beams, weather coursing, substrate layer to hold hoordies, tiles sunshade
Plastering of 9" walls and partition walls
Anti-Termite Treatment – Foundation & Basement
Water proof Treatment -O.H.T, Sump, Weathering coarse etc
Thermal insulation – Weathering coarse
Laying works
Flooring/Skirting: Vitrified Tiles
Skirting: Vitrified Tiles
Flooring (Toilet): Ceramic Tiles – Toilet – 7'0" height, Kitchen – 2'0" ht. Above platform
Kitchen platform: 2'0" wide granite
Wash area: 3'0" ht. Dadoing 8"X12"
Skirting: Ceramic Tiles 12"X4"
Wood works Teak Wood 7' high 3'6" wide three sided door frames for main door only
5" X 3" cross section
Skin door 7' high 3'0" wide three sided door frames for bed rooms 4" x2.5" cross section
7' high 2' 9" wide three sided door frames for toilets 4" x2.5" cross section
Steel works
Grills: 12mm thick square rods. Well de rusted, red oxide coated and painted
Electrical works
Supply mains: 3 phase supply through bus bar; HRC fuses
Power distribution: 5 amps and 15 amps as per the tabulation MCBs mounted in distribution board
Circuit wiring: Insulated copper conductors concealed in PVC conduits and provided with earthing for each circuit and earth pits in ground
Switches: Modular
Painting works
Tractor Emulsion: Two coats of Putty finish
Wood primer: One coat for all doors
Varnish: Main door only
Plumbing works
Water lines: Graded sections of GI -class B pipes (mains) branching into GI – Class B pipes 3/4" & 1/2"
Solid waste: PVC lines with inspection chambers at each exit point
Liquid waste: PVC lines with inspection chambers at each exit point
Vent lines: Connected to all European water closets
Vitreous(white) sanitary fittings: Wash basin (21") in toilets, IWC / EWC with vent in toilets, Provision for Exhaust
Peripheral
One Sump: To provide 12,000 ltrs per day
One Over head tank capacity- 8,000 Ltrs
Site improvement
Compound wall: 4 1/2" compound wall of 5' 0''
Lift: 2 Nos with 8 Passengers capacity